For 1 m³ of M20 concrete at the site volume mix of 1:1.5:3 (common practice), you need about 8.1 bags of cement (403 kg), 0.42 m³ of sand and 0.84 m³ of aggregate, with the usual 1.54 dry-volume factor. IS 456 itself sets nominal mixes by mass. Enter your slab, beam or footing sizes below in feet or metres for cement bags, sand and aggregate in m³ and cft. M25 and above need a design mix.
Free · no sign-in
Site volume mix (common practice) for M20: 1:1.5:3. Not an IS 456 value: IS 456 sets M20 by mass (Table 9), and a volume mix does not guarantee its limits.
A site convention, not a code value.
1,440 is the IS 875 (Part 1) unit weight of ordinary cement.
The common bag size is 50 kg.
Enter length, width and thickness to see the materials.
Cost estimate only. Cement, TMT steel, sand, aggregate and bricks are shown for cost estimation only. They can't be sourced or requested on Nirmaan.
For planning only: your engineer confirms the quantities. No structural design.
IS 456:2000 asks for cement and aggregate to be measured by mass (clause 10.2), and its Table 9 sets nominal mixes by mass: the most sand plus aggregate and the most water per 50 kg bag of cement (last two columns). Many sites still batch by volume, with the site volume mixes in the second column. These are common practice, not IS 456 values, and they are not equivalent to Table 9: a volume mix does not guarantee the Table 9 limits. IS 456 allows volume batching only where weighing is not practical and the bulk densities of the actual materials have been established (clause 10.2.4).
| Grade | Site volume mix, common practice (cement : sand : aggregate) | Cement per m³ at the site volume mix (bags, approx.) | IS 456 Table 9, by mass: max sand + aggregate per 50 kg cement (kg) | IS 456 Table 9: max water per 50 kg cement (litres) |
|---|---|---|---|---|
| M5 | 1:5:10 | 2.77 | 800 | 60 |
| M7.5 | 1:4:8 | 3.41 | 625 | 45 |
| M10 | 1:3:6 | 4.44 | 480 | 34 |
| M15 | 1:2:4 | 6.34 | 330 | 32 |
| M20 | 1:1.5:3 | 8.06 | 250 | 30 |
Example: at 1:4:8, one 50 kg bag (about 0.0347 m³ at 1,440 kg/m³) goes with about 0.417 m³ of loose sand and aggregate. That stays within the M7.5 cap of 625 kg only if they weigh no more than 1,500 kg per m³ loose, which depends on your materials. The same break-even is 1,536 kg/m³ for 1:5:10 (M5), 1,536 for 1:3:6 (M10), 1,584 for 1:2:4 (M15) and 1,600 for 1:1.5:3 (M20). Bags per m³ use this page's assumptions (1.54 dry-volume factor, 1,440 kg/m³ cement, 50 kg bags). Table 9 also sets fine to coarse aggregate by mass at generally 1:2, within 1:1.5 and 1:2.5, and clause 9.3 allows nominal mixes only up to M20.
IS 456:2000 allows nominal mix concrete only for M20 or lower (clause 9.3), and its Table 9 stops at M20. M25 and stronger grades must be design mixes: proportions worked out for your actual cement, sand and aggregate by a lab or your engineer, using IS 10262:2019 (concrete mix proportioning – guidelines). That is why this calculator gives no fixed M25 ratio.
Some websites give 1:1:2 as a thumb rule for M25, but it is not an IS 456 nominal mix, and an M25 mix should not be batched from it. Even for M20 and below, IS 456 prefers a design mix (clause 9.1.1). The calculator still gives the concrete volume for any grade.
PCC is plain cement concrete: concrete without reinforcement, used for example as a levelling bed under footings or under a floor. IS 456 does not fix one PCC ratio. Its Table 5 sets a minimum grade for plain concrete by exposure (below), and clause 6.1.3 allows lower grades for plain concrete work, lean concrete, simple foundations and foundations for masonry walls. Your engineer picks the grade; choose that grade in the calculator to get the materials.
| Exposure | Plain concrete: minimum grade | Plain concrete: max free w/c | Reinforced concrete: minimum grade | Reinforced concrete: max free w/c |
|---|---|---|---|---|
| Mild | Not specified | 0.60 | M20 | 0.55 |
| Moderate | M15 | 0.60 | M25 | 0.50 |
| Severe | M20 | 0.50 | M30 | 0.45 |
| Very severe | M20 | 0.45 | M35 | 0.45 |
| Extreme | M25 | 0.40 | M40 | 0.40 |
From IS 456:2000 Table 5, for normal-weight aggregate of 20 mm nominal maximum size; note 2 of the table says no minimum grade is specified for plain concrete in mild exposure. Your engineer decides the exposure class from the site conditions.
Sources
On many sites M20 is batched by volume at the site volume mix of 1:1.5:3 (common practice; cement : sand : aggregate). That is not the IS 456 definition. IS 456:2000 sets the M20 nominal mix by mass (Table 9): at most 250 kg of sand plus aggregate (fine to coarse generally 1:2) and at most 30 litres of water per 50 kg of cement, and it asks for cement and aggregate to be weighed (clause 10.2). A volume mix does not guarantee those limits.
Many sites batch M15 by volume at the site volume mix of 1:2:4 (common practice). IS 456 Table 9 sets M15 by mass instead: at most 330 kg of sand plus aggregate and 32 litres of water per 50 kg of cement. A volume mix does not guarantee those limits.
There is no standard nominal ratio. IS 456:2000 allows nominal mixes only up to M20 (clause 9.3); M25, M30, M40 and higher must be design mixes, proportioned for your materials by a lab or your engineer using IS 10262:2019 (concrete mix proportioning – guidelines). The 1:1:2 that some websites give for M25 is a thumb rule, but it is not an IS 456 nominal mix.
It depends on the grade. Site volume mixes in common practice are 1:5:10 (M5), 1:4:8 (M7.5), 1:3:6 (M10), 1:2:4 (M15), 1:1.5:3 (M20). IS 456 does not use these ratios: it sets nominal mixes by mass (Table 9) and asks for cement and aggregate to be weighed (clause 10.2), so a volume mix does not guarantee its limits. Above M20, use a design mix.
For nominal mixes, IS 456 Table 9 caps the water per 50 kg of cement at 60 (M5), 45 (M7.5), 34 (M10), 32 (M15), 30 (M20) litres, a water-cement ratio of at most 0.60 for M20. For reinforced concrete, Table 5 sets a lower maximum free water-cement ratio by exposure: 0.55 (mild), 0.50 (moderate), 0.45 (severe), 0.45 (very severe), 0.40 (extreme). Where both apply, the lower limit governs, so reinforced M20 in mild exposure is at most 0.55. Your engineer sets the exact value for your site.
At the site volume mixes (common practice) and this page's assumptions: about 8.06 bags (403 kg) for M20, 6.34 for M15 and 4.44 for M10, before rounding up to whole bags. A mix batched by mass, or a design mix, can need a different amount.
Loose cement, sand and aggregate take up more space than the concrete they make, because the gaps between the particles fill up when they are mixed and compacted. Sites allow for that by multiplying the wet volume, most often by 1.54. It is a convention, not a code value, so you can change it in the calculator.
PCC is plain cement concrete, without reinforcement. IS 456 fixes no PCC ratio: Table 5 sets a minimum grade for plain concrete by exposure (M15 for moderate, M20 for severe, none specified for mild), and clause 6.1.3 allows lower grades for lean concrete and simple foundations. Your engineer picks the grade.
Multiply by 35.315: 1 m³ = 35.315 cft, because 1 ft = 0.3048 m exactly. To go back, 1 cft = 0.0283 m³.