The common site volume mixes (cement : sand : aggregate) are M5 1:5:10, M7.5 1:4:8, M10 1:3:6, M15 1:2:4 and M20 1:1.5:3. M25 and above have no fixed ratio: IS 456 requires a design mix for them. These volume ratios are common site practice, not IS 456 text, because IS 456 sets nominal mixes by mass. Reinforced (RCC) work needs your engineer's specification. For how many bags and how much sand and aggregate a job needs, use the concrete calculator.
Last reviewed: 28 Nov 2026
| Grade | Site volume mix, common practice (cement : sand : aggregate) | Commonly used for (engineer decides) |
|---|---|---|
| M5 | 1:5:10 | Lean filling and levelling where almost no strength is needed |
| M7.5 | 1:4:8 | PCC bed under footings and under plinth beams |
| M10 | 1:3:6 | PCC bed under foundations; base under a floor |
| M15 | 1:2:4 | PCC under heavier footings; floor base; plain (unreinforced) work |
| M20 | 1:1.5:3 | RCC slab, beam and column in a low-rise house where the engineer classes the exposure as mild (protected from weather). Footings in soil and RCC exposed to rain are 'moderate' exposure under IS 456 Table 3, where the minimum is M25 (clause 6.1.3 allows lower grades for simple foundations; your engineer decides). |
| M25 | No fixed ratio: design mix required | Columns and slabs where the engineer specifies it, and RCC in moderate or harsher exposure |
These volume ratios are common site practice, not IS 456 text. A volume mix does not guarantee the IS 456 limits below.
The letter M stands for mix. The number is the characteristic compressive strength of the concrete in N/mm² (also written MPa) at 28 days, tested on 150 mm cubes. M20 means 20 N/mm² at 28 days; M25 means 25. A higher number means stronger concrete, and it also means more cement and tighter quality control.
A nominal mix uses fixed proportions without a laboratory trial. IS 456:2000 allows nominal mixes only for M20 or lower (clause 9.3), and its Table 9 sets them by mass: the most sand plus aggregate and the most water per 50 kg bag of cement, shown below. A design mix is worked out for your actual cement, sand and aggregate by a lab or your engineer, using IS 10262:2019. IS 456 prefers a design mix even at M20 and below (clause 9.1.1), and requires one for M25 and above.
| Grade | Max sand + aggregate (kg) | Max water (litres) |
|---|---|---|
| M5 | 800 | 60 |
| M7.5 | 625 | 45 |
| M10 | 480 | 34 |
| M15 | 330 | 32 |
| M20 | 250 | 30 |
Table 9 prints no volume ratio. For example, M5 allows at most 800 kg of sand plus aggregate per 50 kg of cement and M20 at most 250 kg. IS 456 allows batching by volume only where weighing is not practical and the bulk densities of the actual materials have been established (clause 10.2.4).
1:1:2 is a commonly quoted proportion for M25, but it is not an IS 456 nominal mix. IS 456 requires a design mix for M25 and above, so an M25 mix should not be batched from a thumb rule. Ask your engineer or a lab for the mix for your materials.
PCC is plain cement concrete: concrete without reinforcement, used for example as a levelling bed under footings or a floor. IS 456 does not fix one PCC ratio. Its Table 5 sets a minimum grade for plain concrete by exposure (M15 in moderate exposure, none specified in mild), and clause 6.1.3 allows lower grades for plain concrete, lean concrete and simple foundations. The grade your engineer picks sets the mix: M7.5 (1:4:8) and M10 (1:3:6) are the usual site volume mixes for PCC beds.
The water-cement ratio is the weight of free water divided by the weight of cement. Less water gives stronger, more durable concrete, as long as the mix can still be placed and compacted. IS 456 Table 5 caps it: for reinforced concrete in mild exposure the maximum is 0.55 with a minimum grade of M20; in moderate exposure the minimum grade becomes M25. Footings, roof slabs and outside columns are usually moderate exposure. The Table 9 water limits above apply to nominal mixes, and for reinforced concrete the lower limit applies. Water already in damp sand counts as part of the water.
Your engineer decides, from the drawing and the exposure. In common practice M7.5 or M10 is used for the PCC bed under footings. M20 is the lowest grade for RCC, and only where the exposure is mild (protected from weather). Footings in soil, roof slabs and outside columns are usually moderate exposure under IS 456 Table 3, where the minimum is M25 (clause 6.1.3 allows lower grades for simple foundations; your engineer decides), which needs a design mix.
M20 has a characteristic strength of 20 N/mm² at 28 days and M25 has 25 N/mm². IS 456 Table 5 sets M20 as the minimum grade for RCC in mild exposure and M25 in moderate exposure. M20 may be a nominal mix with the engineer-in-charge's permission, though a design mix is preferred; M25 always needs a design mix.
A nominal mix uses fixed proportions set by IS 456 Table 9 without a laboratory trial, and IS 456 allows it only up to M20. A design mix is worked out for your actual cement, sand and aggregate by a lab or your engineer using IS 10262:2019, and it is required for M25 and above.
The common site volume mix for M10 is 1:3:6. It is mostly used for PCC beds under foundations and as a floor base. It is a site practice, not an IS 456 value.
M means mix, and the number is the characteristic compressive strength in N/mm² at 28 days. M7.5 is 7.5 N/mm², M15 is 15 N/mm² and M20 is 20 N/mm².
IS 456 allows nominal mixes up to M20 only with the engineer-in-charge's permission, and prefers a design mix. For a slab, beam or column, use the grade and mix your engineer specifies.
It depends on the slab volume, the grade and the mix. Enter your sizes in the concrete calculator for cement bags, sand and aggregate in m³ and cft.